PRASTOWO, HENDYKO DWI (2012) Metode pelaksanaan struktur atas (kolom balok shearwall corewall proyek the windsor puri indah residence)Jakarta Barat. S1 thesis, Universitas Mercu Buana.
Full text not available from this repository.| Item Type: | Thesis (S1) |
|---|---|
| Call Number: | KP/11/12/015 |
| NIM/NIDN Creators: | 41109010064 |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 23 Dec 2012 09:56 |
| Last Modified: | 02 Mar 2026 02:37 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/35146 |
Actions (login required)
![]() |
View Item |
