ANALISA PERUBAHAN METODE FORMWORK KONVENSIONAL MENJADI FORMWORK PREFABRIKASI PADA PROYEK HIGH RISE BUILDING (Studi Kasus : Proyek The Kensington Royal Suites)

Z, WAHYU FRADIKA (2017) ANALISA PERUBAHAN METODE FORMWORK KONVENSIONAL MENJADI FORMWORK PREFABRIKASI PADA PROYEK HIGH RISE BUILDING (Studi Kasus : Proyek The Kensington Royal Suites). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
1. Cover.pdf

Download (614kB) | Preview
[img]
Preview
Text (ABSTRAK)
2. Abstrak.pdf

Download (108kB) | Preview
[img] Text (BAB I)
3. Bab I - Pendahuluan.pdf
Restricted to Registered users only

Download (166kB)
[img] Text (BAB II)
4. Bab II - Tinjauan Pustaka.pdf
Restricted to Registered users only

Download (446kB)
[img] Text (BAB III)
5. Bab III - Metode Penelitian.pdf
Restricted to Registered users only

Download (268kB)
[img] Text (BAB IV)
6. Bab IV - Hasil dan Analisis.pdf
Restricted to Registered users only

Download (3MB)
[img] Text (BAB V)
7. Bab V - Penutup.pdf
Restricted to Registered users only

Download (130kB)
[img] Text (DAFTAR PUSTAKA)
8. Daftar Pustaka.pdf
Restricted to Registered users only

Download (107kB)
Item Type: Thesis (S1)
Call Number CD: FT/SIP. 17 034
NIM/NIDN Creators: 41115110086
Uncontrolled Keywords: Metode Formwork, Waktu Proyek, CYCLONE, Biaya Proyek
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 18 Feb 2017 15:47
Last Modified: 25 May 2022 04:32
URI: http://repository.mercubuana.ac.id/id/eprint/32844

Actions (login required)

View Item View Item