Z, WAHYU FRADIKA (2017) ANALISA PERUBAHAN METODE FORMWORK KONVENSIONAL MENJADI FORMWORK PREFABRIKASI PADA PROYEK HIGH RISE BUILDING (Studi Kasus : Proyek The Kensington Royal Suites). S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Cover.pdf Download (614kB) | Preview |
|
|
Text (ABSTRAK)
2. Abstrak.pdf Download (108kB) | Preview |
|
Text (BAB I)
3. Bab I - Pendahuluan.pdf Restricted to Registered users only Download (166kB) |
||
Text (BAB II)
4. Bab II - Tinjauan Pustaka.pdf Restricted to Registered users only Download (446kB) |
||
Text (BAB III)
5. Bab III - Metode Penelitian.pdf Restricted to Registered users only Download (268kB) |
||
Text (BAB IV)
6. Bab IV - Hasil dan Analisis.pdf Restricted to Registered users only Download (3MB) |
||
Text (BAB V)
7. Bab V - Penutup.pdf Restricted to Registered users only Download (130kB) |
||
Text (DAFTAR PUSTAKA)
8. Daftar Pustaka.pdf Restricted to Registered users only Download (107kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/SIP. 17 034 |
NIM/NIDN Creators: | 41115110086 |
Uncontrolled Keywords: | Metode Formwork, Waktu Proyek, CYCLONE, Biaya Proyek |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 18 Feb 2017 15:47 |
Last Modified: | 25 May 2022 04:32 |
URI: | http://repository.mercubuana.ac.id/id/eprint/32844 |
Actions (login required)
View Item |