Pengaruh critical path metode dalam penjadwalan kegiatan produksi transformer di PT XXX

TRIANISLISMA, YENI (2006) Pengaruh critical path metode dalam penjadwalan kegiatan produksi transformer di PT XXX. S1 thesis, Universitas Mercu Buana.

Full text not available from this repository.
Item Type: Thesis (S1)
Call Number CD: LT.III
Call Number: STI/06/35 TRI p
NIM/NIDN Creators: 0160311-062
Uncontrolled Keywords: PENGARUH CRITICAL PATH METODE
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 15 Nov 2006 11:06
Last Modified: 24 Oct 2026 03:30
URI: http://repository.mercubuana.ac.id/id/eprint/31293

Actions (login required)

View Item View Item