Adnan, Indra Perdana (2007) Analisis prospektiv PT. Indocement tunggal prakasa TBK dg menggunakan discounted cash flow valuation. S1 thesis, Universitas Mercu Buana.
Text (Full Text)
Full Text.pdf Restricted to Registered users only Download (653kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FE/MJ. 07 121 |
Call Number: | SE/07/380 PER a |
NIM/NIDN Creators: | 4310411-047 |
Uncontrolled Keywords: | CASH FLOW VALUATION |
Divisions: | Fakultas Ekonomi dan Bisnis > Manajemen |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 13 Feb 2008 13:13 |
Last Modified: | 04 Jun 2017 05:40 |
URI: | http://repository.mercubuana.ac.id/id/eprint/30608 |
Actions (login required)
View Item |