Sulistio, Wasis Eka (2008) Keseimbangan lintasan untuk mengurangi idle time pada proses pembuatan air cleaner IMV 2KD di PT Denso Indonesia. S1 thesis, Universitas Mercu Buana.
Text (FULL SKRIPSI)
01603-036 Wasis Eka Sulistio.pdf Restricted to Registered users only Download (620kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FTI/IND. 08 026 |
Call Number: | STI/09/099 |
NIM/NIDN Creators: | 01603-036 |
Uncontrolled Keywords: | Keseimbangan lintasan, mengurangi idle time, proses pembuatan air cleaner, IMV 2KD, PT Denso Indones |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 11 Dec 2008 13:07 |
Last Modified: | 22 Jul 2022 02:24 |
URI: | http://repository.mercubuana.ac.id/id/eprint/28508 |
Actions (login required)
View Item |