Andryman, (2010) ANALISIS PENGENDALIAN BIAYA PROYEK DENGAN METODE EARNED VALUE PADA PROYEK PEMBANGUNAN PABRIK X DI KARAWANG. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
COVER.pdf Restricted to Registered users only Download (103kB) |
|
|
Text (ABSTRAK)
ABSTRAK.pdf Restricted to Registered users only Download (50kB) |
|
|
Text (BAB I)
BAB I.pdf Restricted to Registered users only Download (65kB) |
|
|
Text (BAB II)
BAB II.pdf Restricted to Registered users only Download (281kB) |
|
|
Text (BAB III)
BAB III.pdf Restricted to Registered users only Download (81kB) |
|
|
Text (BAB IV)
BAB IV.pdf Restricted to Registered users only Download (1MB) |
|
|
Text (BAB V)
BAB V.pdf Restricted to Registered users only Download (60kB) |
|
|
Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (50kB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FTPD/SIP. 10 062 |
| Call Number: | STSP/11/10/065 |
| NIM/NIDN Creators: | 41107120002 |
| Uncontrolled Keywords: | Pabrik, Biaya Proyek, Biaya Proyek, |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 08 Dec 2010 11:51 |
| Last Modified: | 24 Dec 2025 04:16 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/23956 |
Actions (login required)
![]() |
View Item |
