APLIKASI SISTEM PERAWATAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN HLP MODEL 550 DI PT. PHILIP MORRIS INDONESIA

PROBOSUTEJO, FIKY ARISWANDI (2010) APLIKASI SISTEM PERAWATAN RELIABILITY CENTERED MAINTENANCE (RCM) PADA MESIN HLP MODEL 550 DI PT. PHILIP MORRIS INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text (HAL COVER)
COVER.pdf

Download (62kB) | Preview
[img]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (23kB) | Preview
[img] Text (BAB I)
11. Bab I Pendahuluan.pdf
Restricted to Registered users only

Download (86kB)
[img] Text (BAB II)
12. Bab II Landasan Teori.pdf
Restricted to Registered users only

Download (521kB)
[img] Text (BAB III)
13. Bab III Pengumpulan Data Dan Analisa Serta Pengambilan Tindakan.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB IV)
14. BAB 1V Kesimpulan dan Saran.pdf
Restricted to Registered users only

Download (25kB)
[img] Text (DAFTAR PUSTAKA)
DAFTAR PUSTAKA.pdf
Restricted to Registered users only

Download (26kB)

Abstract

HLP model 550 is an automatic packer machine. The main function of this machine is to fold paper box and pack bundle cigarette in the paper box. This machine capacity is 500 pack per minute. Paper box components comprise blank pack, inner linner and aluminium foil paper. All of material are assembly by glue. Glue distribute and applied by glue reservoir, glue jet and glue pot which is an object of this observation. Reliability Centered Maintenance is a proces used to determine what must be done to ensure that any physical asset continues to do what its user want it to do in its present operating context. RCM which used in this observation have 3 main tools for decision process. The tools are FMEA, RCM decision diagram and RCM decision table. The results of RCM application are time interval for maintenance which devide in shiftly maintenance, daily maintenance, weekly maintenance, monthly maintenance, 3 monthly maintenance, 6 monthly maintenance and yearly maintenance. Types of maintenance which used are preventive maintenance, predictive maintenace and no schedule maintenance. Preventive maintenance applied if the system failure which maintenance method has known. Predictive maintenance applied if the method to predict the failure has known and then no scheduled maintenance applied if the system not have maintenance method yet. Keywords : RCM, Preventive maintenance, FMEA

Item Type: Thesis (S1)
Call Number CD: FT/MSN. 10 053
Call Number: STI/13/10/058
NIM/NIDN Creators: 41308120029
Uncontrolled Keywords: Sistem Perawatan
Divisions: Fakultas Teknik > Teknik Mesin
Depositing User: Admin Perpus UMB
Date Deposited: 11 Jan 2011 11:31
Last Modified: 19 May 2025 04:24
URI: http://repository.mercubuana.ac.id/id/eprint/23751

Actions (login required)

View Item View Item