Semanding, Yogyawan (2012) ANALISIS KINERJA JALAN RAYA SERPONG AKIBAT PENGATURAN WAKTU OPERASI ANGKUTAN BARANG DI JALAN TOL DALAM KOTA DKI. JAKARTA (STUDI KASUS RUAS PINTU TOL SERPONG - PINTU TOL KEBON NANAS). S1 thesis, Universitas Mercu Buana.
|
Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (2MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FTPD/SIP. 12 036 |
| Call Number: | STSP/11/12/036 |
| NIM/NIDN Creators: | 41108010016 |
| Uncontrolled Keywords: | Tingkat pelayanan jalan, PM No 62 2011, Perwal no 3 2012, Kendaraan berat |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 14 Aug 2012 12:49 |
| Last Modified: | 23 Dec 2025 07:35 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/21121 |
Actions (login required)
![]() |
View Item |
