STUDI KEBUTUHAN UNDERPASS PADA PERPOTONGAN JALAN KA DENGAN JALAN RAYA (STUDI KASUS PERLINTASAN CITAYAM, DEPOK)

Wijaya, Wandhi (2012) STUDI KEBUTUHAN UNDERPASS PADA PERPOTONGAN JALAN KA DENGAN JALAN RAYA (STUDI KASUS PERLINTASAN CITAYAM, DEPOK). S1 thesis, Universitas Mercu Buana.

[img] Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf
Restricted to Registered users only

Download (2MB)
Item Type: Thesis (S1)
Call Number CD: FTPD/SIP. 12 033
Call Number: STSP/11/12/033
NIM/NIDN Creators: 41108010037
Uncontrolled Keywords: Level of Service (LOS), Antrian, Geometrik jalan, Underpass, Tingkat kedatangan, Tingkat pelayanan,
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 14 Aug 2012 12:36
Last Modified: 23 Dec 2025 07:59
URI: http://repository.mercubuana.ac.id/id/eprint/21118

Actions (login required)

View Item View Item