Yulmiati, Ema (2012) ANALISIS PERBANDINGAN METODE PELAKSANAAN SISTEM TOP DOWN DAN BOTTOM UP PADA KONTRUKSI (KASUS GEDUNG DPRD DKI JAKARTA). S1 thesis, Universitas Mercu Buana.
|
Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (4MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FTPD/SIP. 12 012 |
| Call Number: | STSP/11/12/012 |
| NIM/NIDN Creators: | 41109110030 |
| Uncontrolled Keywords: | Perbandingan metode pelaksanaan sistem top down dan bottom up |
| Divisions: | Fakultas Teknik > Teknik Sipil |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 15 Mar 2012 11:23 |
| Last Modified: | 24 Dec 2025 02:13 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/20262 |
Actions (login required)
![]() |
View Item |
