Analisis Pencegahaan dan Efisiensi Pekerjaan Tambah kurang / Change Order (CO) pada proyek konstruksi (studi kasus pada proyek New OPD mayapada Hospital Tangerang)

Irsadi, Ahmad (2011) Analisis Pencegahaan dan Efisiensi Pekerjaan Tambah kurang / Change Order (CO) pada proyek konstruksi (studi kasus pada proyek New OPD mayapada Hospital Tangerang). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
cover lengkap.pdf

Download (496kB) | Preview
[img]
Preview
Text (ABSTRAK)
ABSTRAK.pdf

Download (83kB) | Preview
[img] Text (BAB I)
BAB I.pdf
Restricted to Registered users only

Download (125kB)
[img] Text (BAB II)
BAB II.pdf
Restricted to Registered users only

Download (180kB)
[img] Text (BAB III)
BAB III.pdf
Restricted to Registered users only

Download (151kB)
[img] Text (BAB IV)
BAB IV.pdf
Restricted to Registered users only

Download (4MB)
[img] Text (BAB V)
BAB V.pdf
Restricted to Registered users only

Download (92kB)
[img] Text (DAFTAR PUSTAKA)
pustaka lengkap.pdf
Restricted to Registered users only

Download (235kB)
Item Type: Thesis (S1)
Call Number CD: FTPD/SIP. 11 042
Call Number: STSP/11/11/013
NIM/NIDN Creators: 41105110005
Uncontrolled Keywords: Pekerjaan tambahan kurang, Cange Order (CO), penyebab, proteksi, efisien.
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Admin Perpus UMB
Date Deposited: 13 Apr 2011 11:15
Last Modified: 26 Sep 2022 07:42
URI: http://repository.mercubuana.ac.id/id/eprint/19385

Actions (login required)

View Item View Item