Aminuddin, Amir (2011) PERANCANGAN MODIFIKASI POMPA RECIPROCATING GUNA MENINGKATKAN VOLUME ALIR (DEBIT). S1 thesis, Universitas Mercu Buana.
|
Text (TUGAS AKHIR FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (999kB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/MSN. 10 037 |
| Call Number: | STI/13/11/020 |
| NIM/NIDN Creators: | 41306120006 |
| Divisions: | Fakultas Teknik > Teknik Mesin |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 19 Apr 2011 10:50 |
| Last Modified: | 09 Dec 2025 02:54 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/19239 |
Actions (login required)
![]() |
View Item |
