Tampubolon, Doppon (2012) Penerapan Metode Line Balancing Untuk Menrencanakan Ke seimbangan Linu Produksi Pada Line Sewing 10 Pada Perakitan Sepatu Nike. S1 thesis, Universitas Mercu Buana.
|
Text (COVER)
1. Hal Cover.pdf Download (177kB) | Preview |
|
|
Text (ABSTRAK)
Abstrak.pdf Download (70kB) | Preview |
|
Text (BAB I)
Bab 1.pdf Restricted to Registered users only Download (136kB) |
||
Text (BAB II)
Bab 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
Bab 3.pdf Restricted to Registered users only Download (188kB) |
||
Text (BAB IV)
Bab 4.pdf Restricted to Registered users only Download (2MB) |
||
Text (BAB V)
Bab 5.pdf Restricted to Registered users only Download (410kB) |
||
Text (BAB VI)
Bab 6.pdf Restricted to Registered users only Download (101kB) |
||
Text (DAFTAR PUSTAKA & LAMPIRAN)
Hal Daftar Pustaka dan lampiran.pdf Restricted to Registered users only Download (215kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 12 050 |
Call Number: | STI/16/12/050 |
NIM/NIDN Creators: | 41607110002 |
Uncontrolled Keywords: | Keseimbangan Lintasan Methods Time Measurement |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 11 Apr 2012 13:15 |
Last Modified: | 22 Jul 2022 02:21 |
URI: | http://repository.mercubuana.ac.id/id/eprint/17842 |
Actions (login required)
View Item |