Firdaus, (2012) TINJAUAN PELAKSANAAN KONSTRUKSI PEMBANGUNAN MENARA BTS (BASE TRANSCEIVER STATION) PADA ROOFTOP TERHADAP BIAYA, MUTU DAN WAKTU PADA PROYEK INDOSAT 3G 2010 PT. ERICSSON INDONESIA. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Cover.pdf Download (2MB) | Preview |
|
|
Text (ABSTRAK)
2. ABSTRAK.pdf Download (54kB) | Preview |
|
Text (BAB I)
3. BAB 1.pdf Restricted to Registered users only Download (87kB) |
||
Text (BAB II)
4. BAB 2.pdf Restricted to Registered users only Download (511kB) |
||
Text (BAB III)
5. BAB 3.pdf Restricted to Registered users only Download (87kB) |
||
Text (BAB IV)
6. BAB 4.pdf Restricted to Registered users only Download (232kB) |
||
Text (BAB V)
7. BAB 5.pdf Restricted to Registered users only Download (72kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
8. Hal Daftar Pustaka & Lampiran.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FTPD/SIP. 12 009 |
Call Number: | STSP/11/12/009 |
NIM/NIDN Creators: | 41108110093 |
Uncontrolled Keywords: | Perencanaan dan Pengendalian Proyek, Telekomunikasi, Civil, Mechanical Engineering (CME) , Tower an |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 07 Mar 2012 13:20 |
Last Modified: | 07 Jan 2023 04:11 |
URI: | http://repository.mercubuana.ac.id/id/eprint/17713 |
Actions (login required)
View Item |