Reynaldi, (2012) METODE PELAKSANAAN STRUKTUR ATAS PROYEK THE PROVIDENCE PARK PERMATA HIJAU JAKARTA BARAT. S1 thesis, Universitas Mercu Buana.
|
Text (ABSTRACT)
Isi_abstract_318169739568.pdf Download (54kB) | Preview |
|
|
Text (COVER)
Isi_cover_200577045115.pdf Download (445kB) | Preview |
|
Text (BAB I)
Isi1361797326529.pdf Restricted to Registered users only Download (177kB) |
||
Text (BAB II)
Isi2904848377105.pdf Restricted to Registered users only Download (265kB) |
||
Text (BAB III)
Isi3719776319694.pdf Restricted to Registered users only Download (484kB) |
||
Text (BAB IV)
Isi4320962697076.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB V)
Isi5448798508890.pdf Restricted to Registered users only Download (938kB) |
||
Text (BAB VI)
Isi6353126647903.pdf Restricted to Registered users only Download (161kB) |
||
Text (BAB VII)
Isi7788920774238.pdf Restricted to Registered users only Download (277kB) |
||
Text (PUSTAKA)
Isi_pustaka203055095235.pdf Restricted to Registered users only Download (1MB) |
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41109010026 |
Uncontrolled Keywords: | PT Multikon, Metode, Struktur Atas, Proyek, The Providence Park Permata Hijau, Jakarta Barat |
Divisions: | Fakultas Teknik > Teknik Sipil |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 20 Jan 2014 10:22 |
Last Modified: | 06 Feb 2023 04:46 |
URI: | http://repository.mercubuana.ac.id/id/eprint/17635 |
Actions (login required)
View Item |