Andry, Yuzi (2013) Analisis penerapan toyota production system (TPS) untuk memperpendek lead time dan meningkatkan produktivitas pada line frame main tipe KZLG (Honda Spacy) di PT.DP-DAC. S2 thesis, Universitas Mercu Buana.
Full text not available from this repository.Item Type: | Thesis (S2) |
---|---|
Call Number: | TM/51/13/022 |
NIM/NIDN Creators: | 55110110099 |
Divisions: | Pascasarjana > Magister Manajemen |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 08 Jan 2013 10:44 |
Last Modified: | 17 May 2017 07:54 |
URI: | http://repository.mercubuana.ac.id/id/eprint/14903 |
Actions (login required)
View Item |