ANALISA PERBAIKAN SISTEM KERJA KALIBRASI HYDROMETER DENGAN METODE PERHITUNGAN WAKTU BAKU (Studi Kasus di PT. CTS Indonesia)

PAMBUDHIAKSO, ARIYADHI (2013) ANALISA PERBAIKAN SISTEM KERJA KALIBRASI HYDROMETER DENGAN METODE PERHITUNGAN WAKTU BAKU (Studi Kasus di PT. CTS Indonesia). S1 thesis, Universitas Mercu Buana Jakarta.

[img] Text (SKRIPSI FULL)
SKRIPSI FULL.pdf
Restricted to Registered users only

Download (1MB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 13 053
Call Number: ST/16/13/064
NIM/NIDN Creators: 41611120104
Uncontrolled Keywords: Kalibrasi Hydrometer, penentuan waktu baku, metode statistik, tata letak fasilitas, penyesuaian, kel
Subjects: 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 000. Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 003 Systems/Sistem-sistem
100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 01 Oct 2013 10:46
Last Modified: 10 Mar 2026 08:09
URI: http://repository.mercubuana.ac.id/id/eprint/14774

Actions (login required)

View Item View Item