PAMBUDHIAKSO, ARIYADHI (2013) ANALISA PERBAIKAN SISTEM KERJA KALIBRASI HYDROMETER DENGAN METODE PERHITUNGAN WAKTU BAKU (Studi Kasus di PT. CTS Indonesia). S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (SKRIPSI FULL)
SKRIPSI FULL.pdf Restricted to Registered users only Download (1MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/IND. 13 053 |
| Call Number: | ST/16/13/064 |
| NIM/NIDN Creators: | 41611120104 |
| Uncontrolled Keywords: | Kalibrasi Hydrometer, penentuan waktu baku, metode statistik, tata letak fasilitas, penyesuaian, kel |
| Subjects: | 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 000. Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 003 Systems/Sistem-sistem 100 Philosophy and Psychology/Filsafat dan Psikologi > 150 Psychology/Psikologi > 154 Subconscious and Altered States and Process/Psikologi Bawah Sadar > 154.6 Sleep Phenomena/Fenomena Tidur > 154.63 Dreams/Mimpi > 154.634 Analysis/Analisis |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 01 Oct 2013 10:46 |
| Last Modified: | 10 Mar 2026 08:09 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/14774 |
Actions (login required)
![]() |
View Item |
