ATUSSOLIHAH, RIVA (2013) Analisa Pendekatan Optimasi Proyek Menggunakan Critical Path Methode (CPM) Studi Kasus Proyek Instalasi CCTV dan Access Control System PT Gunnebo Indonesia di British Embassy. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Cover.pdf Download (1MB) | Preview |
|
|
Text (ABSTRAK)
2.Abstrak.pdf Download (77kB) | Preview |
|
Text (BAB I)
3. Bab 1.pdf Restricted to Registered users only Download (392kB) |
||
Text (BAB II)
4.Bab 2.pdf Restricted to Registered users only Download (1MB) |
||
Text (BAB III)
5. Bab 3.pdf Restricted to Registered users only Download (235kB) |
||
Text (BAB IV)
6. Bab 4.pdf Restricted to Registered users only Download (358kB) |
||
Text (BAB V)
7. Bab 5.pdf Restricted to Registered users only Download (141kB) |
||
Text (BAB VI)
8. Bab 6.pdf Restricted to Registered users only Download (146kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Isi_pustaka269833916326.pdf Restricted to Registered users only Download (531kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 13 131 |
Call Number: | ST/16/13/148 |
NIM/NIDN Creators: | 41611120002 |
Uncontrolled Keywords: | Analisa, Pendekatan, Optimasi, Proyek, Menggunakan, Critical Path Methode, CPM, Studi, Kasus Proyek, |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 15 Sep 2013 17:13 |
Last Modified: | 16 Nov 2022 13:28 |
URI: | http://repository.mercubuana.ac.id/id/eprint/14744 |
Actions (login required)
View Item |