Pratama, Ade (2013) PERHITUNGAN OEE (OVERALL EQUIPMENT EFFECTIVENES) PADA MESIN TRUPUNCH V 5000 I MENUJU TOTAL PRODUCTIVE MAINTENANCE (TPM) PADA PT LASER METAL MANDIRI. S1 thesis, Universitas Mercu Buana.
|
Text (HAL COVER)
1. Hal Cover.pdf Download (1MB) | Preview |
|
|
Text (ABSTRAK)
2.ABSTRAK.pdf Download (42kB) | Preview |
|
Text (BAB I)
3. BAB I.pdf Restricted to Registered users only Download (227kB) |
||
Text (BAB II)
4. BAB II.pdf Restricted to Registered users only Download (987kB) |
||
Text (BAB III)
5. BAB III.pdf Restricted to Registered users only Download (541kB) |
||
Text (BAB IV)
6. BAB IV.pdf Restricted to Registered users only Download (831kB) |
||
Text (BAB V)
7. BAB V.pdf Restricted to Registered users only Download (242kB) |
||
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Isi_pustaka643949506349.pdf Restricted to Registered users only Download (250kB) |
||
Text (BAB VI)
8. BAB VI.pdf Restricted to Registered users only Download (145kB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 13 091 |
Call Number: | ST/16/3/113 |
NIM/NIDN Creators: | 41609010041 |
Uncontrolled Keywords: | Mesin Trupunch v 5000 I, Overall Equipment Effectiveness (OEE), Six Big Losses, Regresi Korelasi |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 11 Sep 2013 12:27 |
Last Modified: | 16 Nov 2022 12:42 |
URI: | http://repository.mercubuana.ac.id/id/eprint/14723 |
Actions (login required)
View Item |