MENGOPTIMALKAN MASTER PRODUCTION SCHEDULE (MPS) DAN MATERIAL REQUIREMENT PLANNING I (MRP I) E-RSPU P/ N 5903 MELALUI PERHITUNGAN ROUGH CUT CAPACITY PLANNING (RCCP) (Studi Kasus Pada PT Selamat Sempurna Tbk.)

Worowardani, Endah (2013) MENGOPTIMALKAN MASTER PRODUCTION SCHEDULE (MPS) DAN MATERIAL REQUIREMENT PLANNING I (MRP I) E-RSPU P/ N 5903 MELALUI PERHITUNGAN ROUGH CUT CAPACITY PLANNING (RCCP) (Studi Kasus Pada PT Selamat Sempurna Tbk.). S1 thesis, Universitas Mercu Buana.

[img]
Preview
Text (HAL COVER)
Isi_cover_404078077386.pdf

Download (1MB) | Preview
[img]
Preview
Text (ABSTRAK)
Isi_abstract_430552106650.pdf

Download (116kB) | Preview
[img] Text (BAB I)
Isi1600870496993.pdf
Restricted to Registered users only

Download (298kB)
[img] Text (BAB II)
Isi2711964022190.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB III)
Isi3350048132090.pdf
Restricted to Registered users only

Download (349kB)
[img] Text (BAB IV)
Isi4325880172642.pdf
Restricted to Registered users only

Download (1MB)
[img] Text (BAB V)
Isi5280484158139.pdf
Restricted to Registered users only

Download (619kB)
[img] Text (BAB VI)
Isi6593357303872.pdf
Restricted to Registered users only

Download (191kB)
[img] Text (DAFTAR PUSTAKA)
Isi_pustaka165364006847.pdf
Restricted to Registered users only

Download (1MB)
Item Type: Thesis (S1)
Call Number CD: FT/IND. 13 050
Call Number: ST/16/13/050
NIM/NIDN Creators: 41609010025
Uncontrolled Keywords: Rough Cut Capacity planning (RCPP), Master Production Planning (MPS), Material Requiretment Planning
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 24 Jul 2013 15:25
Last Modified: 10 Nov 2022 07:12
URI: http://repository.mercubuana.ac.id/id/eprint/14674

Actions (login required)

View Item View Item