Widyanti, Anita Dwi (2014) Pengendalian biaya dan waktu Dalam Estimasi Proyek Dengan Metode Earned Value. S2 thesis, Universitas Mercu Buana.
Full text not available from this repository.Item Type: | Thesis (S2) |
---|---|
Call Number: | TM/51/14/198 |
NIM/NIDN Creators: | 55112110062 |
Uncontrolled Keywords: | Metode Nilai Hasil, BCWS, BCWP, ACWP |
Divisions: | Pascasarjana > Magister Manajemen |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 03 Feb 2015 10:12 |
Last Modified: | 12 May 2017 03:15 |
URI: | http://repository.mercubuana.ac.id/id/eprint/13718 |
Actions (login required)
View Item |