SUGANJAR, (2014) PENERAPAN METODE ANALYTIC NETWORK PROCESS (ANP) DALAM PENETAPAN KRITERIA PEMILIHAN FABRICATOR UNTUK PENGERJAAN KONSTRUKSI DAN PEMIPAAN (PIPING). S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (88kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (238kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (161kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (396kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (121kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (853kB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (238kB) |
||
Text (Bab 6)
Bab 6.pdf Restricted to Registered users only Download (41kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (2MB) |
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND. 14 034 |
NIM/NIDN Creators: | 41613110058 |
Uncontrolled Keywords: | Pemilihan mitra kerja Fabricator, Pengambilan keputusan, Cluster Kriteria - kriteria, Analytical Network Process (ANP), Alternatif |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 25 Jan 2015 14:19 |
Last Modified: | 10 May 2017 07:03 |
URI: | http://repository.mercubuana.ac.id/id/eprint/11243 |
Actions (login required)
View Item |