RIANTO, DENDI ARIF (2014) ANALISA PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DALAM USAHA PERBAIKAN MANAJEMEN PEMELIHARAAN AC KORIDOR DI APARTEMEN PLAZA SENAYAN. S1 thesis, Universitas Mercu Buana.
|
Text (Abstrak)
Abstrak.pdf Download (75kB) | Preview |
|
|
Text (Cover)
Cover.pdf Download (360kB) | Preview |
|
Text (Bab 1)
Bab 1.pdf Restricted to Registered users only Download (50kB) |
||
Text (Bab 2)
Bab 2.pdf Restricted to Registered users only Download (202kB) |
||
Text (Bab 3)
Bab 3.pdf Restricted to Registered users only Download (39kB) |
||
Text (Bab 4)
Bab 4.pdf Restricted to Registered users only Download (467kB) |
||
Text (Bab 5)
Bab 5.pdf Restricted to Registered users only Download (145kB) |
||
Text (Bab 6)
Bab 6.pdf Restricted to Registered users only Download (33kB) |
||
Text (Daftar Pustaka dan Lampiran)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (294kB) |
Item Type: | Thesis (S1) |
---|---|
NIM/NIDN Creators: | 41606120030 |
Uncontrolled Keywords: | Total Production Maintenance, Corrective Maintenance, Fishbone Diagram, Overall Equipment Effectiven |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Admin Perpus UMB |
Date Deposited: | 01 Oct 2014 14:09 |
Last Modified: | 10 May 2017 07:03 |
URI: | http://repository.mercubuana.ac.id/id/eprint/11216 |
Actions (login required)
View Item |