Novian, (2014) PERHITUNGAN DAN ANALISA NILAI OVERALL EQUIPMENT EFFECTIVENESS (OEE) PADA PROSES UNIT BURNING (Studi Kasus PT. Indocement Tunggal Prakarsa,Tbk). S1 thesis, Universitas Mercu Buana.
|
Text (LEMBAR COVER)
Lembar Cover.pdf Restricted to Registered users only Download (558kB) |
|
|
Text (ABSTRAK)
ABSTRAK.pdf Restricted to Registered users only Download (47kB) |
|
|
Text (BAB I)
Tugas Akhir_Novian_BAB 1.pdf Restricted to Registered users only Download (378kB) |
|
|
Text (BAB II)
Tugas Akhir_Novian_BAB 2.pdf Restricted to Registered users only Download (785kB) |
|
|
Text (BAB III)
Tugas Akhir_Novian_BAB 3.pdf Restricted to Registered users only Download (421kB) |
|
|
Text (BAB IV)
Tugas Akhir_Novian_BAB 4.pdf Restricted to Registered users only Download (1MB) |
|
|
Text (BAB V)
Tugas Akhir_Novian_BAB 5.pdf Restricted to Registered users only Download (679kB) |
|
|
Text (BAB VI)
Tugas Akhir_Novian_BAB 6.pdf Restricted to Registered users only Download (292kB) |
|
|
Text (DAFTAR PUSTAKA DAN LAMPIRAN)
Daftar Pustaka dan Lampiran.pdf Restricted to Registered users only Download (1MB) |
| Item Type: | Thesis (S1) |
|---|---|
| Call Number CD: | FT/IND. 14 073 |
| NIM/NIDN Creators: | 41610010034 |
| Uncontrolled Keywords: | Total Productive Maintenance (TPM), Overall Equipment Effectiveness (OEE), Diagram Sebab akibat. |
| Divisions: | Fakultas Teknik > Teknik Industri |
| Depositing User: | Admin Perpus UMB |
| Date Deposited: | 08 Aug 2014 10:16 |
| Last Modified: | 06 Apr 2026 07:09 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/11169 |
Actions (login required)
![]() |
View Item |
