SUYANTA, BEJA (2026) PERENCANAAN PENGEMBANGAN KONSOLIDASI SERVER DAN STORAGE UNTUK MENINGKATKAN SUMBER DAYA DENGAN HYPERCONVERGED INFRASTRUCTURE PADA PT. OIF. S1 thesis, Universitas Mercu Buana Jakarta - Menteng.
|
Text (COVER)
41520110112-BEJA SUYANTA-01 Cover - Beja Suyanta (1).pdf Download (476kB) |
|
|
Text (BAB I)
41520110112-BEJA SUYANTA-02 Bab 1 - Beja Suyanta.pdf Restricted to Registered users only Download (771kB) |
|
|
Text (BAB II)
41520110112-BEJA SUYANTA-03 Bab 2 - Beja Suyanta.pdf Restricted to Registered users only Download (216kB) |
|
|
Text (BAB III)
41520110112-BEJA SUYANTA-04 Bab 3 - Beja Suyanta.pdf Restricted to Registered users only Download (231kB) |
|
|
Text (BAB IV)
41520110112-BEJA SUYANTA-05 Bab 4 - Beja Suyanta.pdf Restricted to Registered users only Download (692kB) |
|
|
Text (BAB V)
41520110112-BEJA SUYANTA-06 Bab 5 - Beja Suyanta.pdf Restricted to Registered users only Download (310kB) |
|
|
Text (DAFTAR PUSTAKA)
41520110112-BEJA SUYANTA-07 Daftar Pustaka - Beja Suyanta.pdf Restricted to Registered users only Download (228kB) |
|
|
Text (LAMPIRAN)
41520110112-BEJA SUYANTA-08 Lampiran - Beja Suyanta.pdf Restricted to Registered users only Download (778kB) |
Abstract
Implementasi Hyperconverged Infrastructure (HCI) dapat menjadi solusi yang efektif dalam mengatasi tantangan IT dalam pemenuhan kebutuhan bisnis dan keterbatasan sistem tradisional. HCI menggabungkan server, penyimpanan, dan jaringan dalam satu platform terintegrasi, sehingga memungkinkan IT untuk bergerak lebih cepat dan menghadapi tuntutan bisnis dengan lebih fleksibel. Pada makalah ini, memberikan perbandingan perhitungan biaya apabila menggunakan sistem tradisional dan menggunakan sistem HCI. Manajemen ruang lingkup (scope management) berfokus pada perencanaan proyek HCI. Ini mencakup identifikasi kebutuhan bisnis, analisis risiko, perencanaan implementasi, dan pemantauan perkembangan proyek HCI. Implementing Hyperconverged Infrastructure (HCI) can be an effective solution to address IT challenges in meeting business needs and the limitations of traditional systems. HCI combines servers, storage, and networking into a single, integrated platform, enabling IT to move faster and meet business demands with greater flexibility. This paper provides a cost comparison between traditional and HCI systems. Scope management focuses on HCI project planning. This includes identifying business needs, analyzing risks, planning implementation, and monitoring HCI project progress.
| Item Type: | Thesis (S1) |
|---|---|
| NIM/NIDN Creators: | 41520110112 |
| Uncontrolled Keywords: | Hyperconverged Infrastructure (HCI); Perencanaan Proyek; Project Charter; Manajemen Biaya Hyperconverged Infrastructure (HCI); Project Planning; Project Charter; Cost Management. |
| Subjects: | 000 Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 000. Computer Science, Information and General Works/Ilmu Komputer, Informasi, dan Karya Umum > 004 Data Processing, Computer Science/Pemrosesan Data, Ilmu Komputer, Teknik Informatika |
| Divisions: | Fakultas Ilmu Komputer > Informatika |
| Depositing User: | ARDIFTA DWI AFRIANI |
| Date Deposited: | 06 Mar 2026 01:48 |
| Last Modified: | 06 Mar 2026 01:48 |
| URI: | http://repository.mercubuana.ac.id/id/eprint/101416 |
Actions (login required)
![]() |
View Item |
