MUSTAQIM, WAHID (2019) PERBAIKAN KUALITAS DEFECT WASHER DENGAN PENDEKATAN PDCA DAN KAIZEN DI PT. MW. S1 thesis, Universitas Mercu Buana Bekasi.
|
Text
1. Halaman Judul.pdf Download (205kB) | Preview |
|
|
Text
2. Lembar Pernyataan.pdf Download (249kB) | Preview |
|
|
Text
3. Lembar Pengesahan.pdf Download (240kB) | Preview |
|
|
Text
4. Abstrak.pdf Download (207kB) | Preview |
|
|
Text
4. Abstrak.pdf Download (207kB) | Preview |
|
|
Text
5. Kata Pengantar.pdf Download (247kB) | Preview |
|
|
Text
6. Daftar Isi.pdf Download (107kB) | Preview |
|
|
Text
7. Daftar Tabel.pdf Download (238kB) | Preview |
|
|
Text
8. Daftar Gambar.pdf Download (244kB) | Preview |
|
![]() |
Text
9. Bab I.pdf Restricted to Registered users only Download (365kB) |
|
![]() |
Text
10. Bab II.pdf Restricted to Registered users only Download (404kB) |
|
![]() |
Text
11. Bab III.pdf Restricted to Registered users only Download (296kB) |
|
![]() |
Text
12. Bab IV.pdf Restricted to Registered users only Download (880kB) |
|
![]() |
Text
13. Bab V.pdf Restricted to Registered users only Download (710kB) |
|
![]() |
Text
14. Bab VI.pdf Restricted to Registered users only Download (214kB) |
|
![]() |
Text
15. Daftar Pustaka.pdf Restricted to Registered users only Download (435kB) |
|
![]() |
Text
16. Lampiran.pdf Restricted to Registered users only Download (643kB) |
Abstract
Quality is one important factor determining the success of a company in mastering competition. In the process of stamping PT. MW, quality is measured through Ppm (Part Per Million), which is a graph of defects that occur at the Stamping plant. In 2019, the Ppm has not yet reached the specified target. One of the defects that contributed greatly to the Ppm is the type of defect bury. The study was conducted using Kaizen through the PDCA cycle. It is known that there are four root causes of defect burry: The condition of the arrangement of parts which are not neat, setting the parameters of the machine that changes due to the displacement of the machine, checking method by man power or operator ie not checking the dimensions periodically, Human or man power that is not stable at one machine will move the engine so that the man power is always new. By making improvements in accordance with the root of the problem that has been found, the result was defect washer clevis reduced by 57.1%. Standards are set to support the progress of the repairs carried out, namely the work standards of how to arrange parts on the box with neat arrangement to ensure the parts are not scratched with other parts when there is a part moving activity, the standard maintenance of stopper dies parameters on dies stamping so that the parameters remain stable, quality standards or Q Point to ensure that man power understands the quality standards of parts that are being made, and the maintenance standards for jig inspection. Keywords: defect; washer; stamping;
Item Type: | Thesis (S1) |
---|---|
Call Number CD: | FT/IND 19 058 |
NIM/NIDN Creators: | 41615320063 |
Uncontrolled Keywords: | defect; washer; stamping; |
Subjects: | 600 Technology/Teknologi > 650 Management, Public Relations, Business and Auxiliary Service/Manajemen, Hubungan Masyarakat, Bisnis dan Ilmu yang Berkaitan > 658 General Management/Manajemen Umum > 658.5 Management of Production/Manajemen Produksi |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | siti maisyaroh |
Date Deposited: | 22 Jul 2022 04:29 |
Last Modified: | 22 Jul 2022 04:41 |
URI: | http://repository.mercubuana.ac.id/id/eprint/65872 |
Actions (login required)
![]() |
View Item |