USULAN PERBAIKAN KUALITAS DENGAN METODE 7 TOOLS PADA DEPARTEMEN PRODUKSI METER CLUSTER DI PT XYZ PLANT 3

THYAS, DHILA PRIHATINING (2021) USULAN PERBAIKAN KUALITAS DENGAN METODE 7 TOOLS PADA DEPARTEMEN PRODUKSI METER CLUSTER DI PT XYZ PLANT 3. S1-Sarjana thesis, Universitas Mercu Buana Jatisampurna.

[img]
Preview
Text
COVER.pdf

Download (411kB) | Preview
[img]
Preview
Text
ABSTRACT.pdf

Download (205kB) | Preview
[img] Text
BAB I.pdf
Restricted to Registered users only

Download (220kB)
[img] Text
BAB II.pdf
Restricted to Registered users only

Download (504kB)
[img] Text
BAB III.pdf
Restricted to Registered users only

Download (337kB)
[img] Text
BAB IV.pdf
Restricted to Registered users only

Download (733kB)
[img] Text
BAB V.pdf
Restricted to Registered users only

Download (199kB)
[img] Text
BAB VI.pdf
Restricted to Registered users only

Download (166kB)
[img] Text
Daftar Pustaka.pdf
Restricted to Registered users only

Download (215kB)

Abstract

ABSTRACT. PT XYZ Plant 3 in June 2014 started production of cluster meters. And in 3 years has established 3 production lines with each line producing 2 types of products with different types. In production, quality becomes the most important in addition to the quantity of production. In this study the authors identify the product damage that occurred in the production department of cluster meters within 6 months. Based on the data that has been processed using 7 tools quality tools. Based on data march-september 2017 production amount 279.146 unit cluster meters, there is still a product damage of 5.308 units or with a damage percentage of 1.90%. In this case there are 3 types of product damage, named foreign material 31.56%, 31% scratch and 29.27% gap ring. From the control chart, all processes are still within the control limits. Although it is known that the highest defect is on april of 2.18% and the lowest on may 1.60%. Therefore, to achieve the company's goals in the absence of defective products or zero defects. Then the cluster meter department needs to make quality improvements. By using fishbone has been known to the factors that cause it, including associated with lack of accuracy, less clean environment, material handling that is inappropriate and the machine maintenance that’s also not scheduled regularly yet. And for the analysis of the proposed repair any damage in the analysis by using 5W+1H. Keyword : 7 Tools, p chart, Fishbone, 5W+1H

Item Type: Thesis (S1-Sarjana)
Call Number CD: FT/IND 17 026
NIM: 41613310011
Uncontrolled Keywords: 7 Tools, p chart, Fishbone, 5W+1H
Subjects: 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik
600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik > 670.1-670.9 Standard Subdivisions of Manufacturing/Subdivisi Standar Dari Manufaktur, Pabrik-pabrik
600 Technology/Teknologi > 680 Manufacture For Specific Uses/Industri Pembuatan produk untuk penggunaan tertentu
600 Technology/Teknologi > 680 Manufacture For Specific Uses/Industri Pembuatan produk untuk penggunaan tertentu > 680.1-680.9 Standard Subdivisions of Manufacture For Specific Uses/Subdivisi Standar Dari Industri Pembuatan Produk Untuk Penggunaan Tertentu
Divisions: Fakultas Teknik > Teknik Industri
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 02 Feb 2021 04:17
Last Modified: 02 Feb 2021 04:17
URI: http://repository.mercubuana.ac.id/id/eprint/59518

Actions (login required)

View Item View Item