ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PADA PROYEK GEDUNG APARTEMEN THE NEWTON 1 KUNINGAN JAKARTA

SAPUTRO, G. ADIE (2021) ANALISIS FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PELAKSANAAN PADA PROYEK GEDUNG APARTEMEN THE NEWTON 1 KUNINGAN JAKARTA. S1-Sarjana thesis, Universitas Mercu Buana Jatisampurna.

[img]
Preview
Text
01.Lembar Judul (COVER).pdf

Download (174kB) | Preview
[img]
Preview
Text
02.Lembar Pengesahan Sidang (i).pdf

Download (545kB) | Preview
[img]
Preview
Text
03.Lembar Pernyataan R1 (ii).pdf

Download (557kB) | Preview
[img]
Preview
Text
04.ABSTRAK R2 Bhs.Indonesia (iii).pdf

Download (265kB) | Preview
[img]
Preview
Text
05.ABSTRACT R2 Bhs.Inggris (iv).pdf

Download (26kB) | Preview
[img]
Preview
Text
06.KATA PENGANTAR R0 (v-iv).pdf

Download (236kB) | Preview
[img]
Preview
Text
07.DAFTAR ISI R2 (vii-ix).pdf

Download (81kB) | Preview
[img] Text
08.BAB I_Pendahuluan R2 (I-1 - I-7).pdf
Restricted to Registered users only

Download (335kB)
[img] Text
09.BAB II_Tinjauan pustaka R2 (II-1 - II-31) new.pdf
Restricted to Registered users only

Download (227kB)
[img] Text
10.BAB III Metodologi Penelitian R1 (III-1 - III-30).pdf
Restricted to Registered users only

Download (1MB)
[img] Text
11.BAB IV ANALALISIS DAN HASIL KETERLAMBATAN R2 (IV-1 - IV-45).pdf
Restricted to Registered users only

Download (985kB)
[img] Text
12.BAB V KESIMPULAN R2 (V-1 - V-2).pdf
Restricted to Registered users only

Download (268kB)
[img] Text
13.DAFTAR PUSTAKA R1 (Pustaka-1 - Pustaka-3).pdf
Restricted to Registered users only

Download (351kB)

Abstract

ABSTRAK Pelaksanaan pembangunan Apartement Ciputra World 2 Phase 3 The Newton 1 ini dikerjakan oleh PT.TATA MULIA NUSANTARA INDAH. Dalam pelaksanaannya banyak menghadapi beberapa kendala yang menyebabkan keterlambatan seperti halnya Faktor bahan, tenaga kerja, peralatan, keuangan, lingkungan, perubahan disain, kontrak, waktu dan kontrol. Tujuan penelitian adalah untuk mendapatkan faktor dominan penyebabkan keterlambatan, dan didapat solusi penyebab keterlambatan, pernulisan ini ditinjau dari kinerja waktu. Metodologi penelitian yang digunakan adalah observasi langsung, pengumpulan data proyek serta studi literatur. Metode Observasi dilakukan dangan mengadakan studi kasus pada proyek, sedangkan metode pengumpulan data dengan proses kuisioner berdasarkan 25 reponden yang terlibat langsung dalam pembamgunan proyek tersebut, yang kemudian data hasil kuisioner akan diuji instrument, Reliabilitas, Analisis Regresi Berganda, Signifikansi Simultan (Uji F), Signifikansi Parsial (Uji t), Koefisien Determinasi (R2 ), Multikolinearitas, Normalitas Kolmogorov-smirnov, Analisis Korelasi Ganda, yang menggunakan sofeware SPSS Versi 25. Dari hasil analisis penyebab dominan keterlambatan proyek pada proyek Gedung Apartemen Ciputra World 2 Phase 3 The Newton 1 Kuningan Jakarta, yakni didapat variabel : X2 = faktor tenaga kerja Kata kunci :Faktor-faktor keterlambatan, Waktu Konstruksi, Analisis, Responden, dan penyelesaian. ABSTRACT The implementation of the Building Aprtement Ciputra World 2 Phase 3 development is done by PT.TATA MULIA NUSANTARA INDAH. In the implementation of construction projects there are often work obstacles that cause poor performance as well as time delays, cost swelling and poor quality. There fore, things that may cause delays in the implementation of a construction project should be noted. The formulation of the problem in this research is the analysis of causes of delay in the implementation in terms of time performance. Research methodologies used by the authors are observation (direct observation), collection of project data and literature study. Observation method was conducted by conducting case study on project , while data collection method was conducted by questionnaire process based on 25 respondents directly involved in the project's devewopment, which then the result of questionnaire will be tested using SPSS Version 25. From the results of the respondents who participated in the construction of the plant and the analysis found there causes of the delay in the Building Aprtement Ciputra World 2 Phase 3 project is indicator delay variable is X2 = Labor Shortages Keywords: Delay Factors, Performance, Time Construction Project, Analysis, Respondents, Settlement and Control.

Item Type: Thesis (S1-Sarjana)
Call Number CD: FT/SIP 19 019
NIM: 41117320039
Uncontrolled Keywords: Faktor-faktor keterlambatan, Waktu Konstruksi, Analisis, Responden, dan penyelesaian.
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Nasruddin Mansyur S.Hum
Date Deposited: 14 Jan 2021 08:18
Last Modified: 14 Jan 2021 08:18
URI: http://repository.mercubuana.ac.id/id/eprint/59114

Actions (login required)

View Item View Item