SUMARNA, ADE NANANG (2019) PENERAPAN PERHITUNGAN WAKTU BAKU DENGAN METODE JAM HENTI (STOPWATCH) DI PT. SUMITOMO S.H.I CONSTRUCTION MACHINERY INDONESIA. S1 thesis, Universitas Mercu Buana Jakarta.
|
Text (HAL COVER)
01.HAL COVER KP.pdf Download (505kB) | Preview |
|
![]() |
Text (BAB I)
02.BAB 1 .pdf Restricted to Registered users only Download (63kB) |
|
![]() |
Text (BAB II)
03.BAB II.pdf Restricted to Registered users only Download (286kB) |
|
![]() |
Text (BAB III)
04.BAB III .pdf Restricted to Registered users only Download (95kB) |
|
![]() |
Text (BAB IV)
05.BAB IV.pdf Restricted to Registered users only Download (387kB) |
|
![]() |
Text (BAB V)
06.BAB V.pdf Restricted to Registered users only Download (52kB) |
|
![]() |
Text (DAFTAR PUSTAKA)
07.DAFTAR PUSTAKA.pdf Restricted to Registered users only Download (88kB) |
Abstract
PENERAPAN PERHITUNGAN WAKTU BAKU DENGAN METODE JAM HENTI (STOPWATCH) DI PT. SUMITOMO S.H.I CONSTRUCTION MACHINERY INDONESIA
Item Type: | Thesis (S1) |
---|---|
NIM: | 41613320017 |
Uncontrolled Keywords: | PENERAPAN PERHITUNGAN WAKTU BAKU DENGAN METODE JAM HENTI (STOPWATCH) DI PT. SUMITOMO S.H.I CONSTRUCTION MACHINERY INDONESIA |
Subjects: | 100 Philosophy and Psychology/Filsafat dan Psikologi > 110 Metaphysics/Metafisika > 115 Time/Waktu 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi 600 Technology/Teknologi > 690 Buildings/Teknik Bangunan > 692 Auxiliary Construction Practices/Lain-lain yang Berhubungan dengan Pekerjaan Konstruksi > 692.5 Estimates of Labor, Time, Materials/Prakiraan Biaya Tenaga Kerja, Waktu dan Bahan-bahan |
Divisions: | Fakultas Teknik > Teknik Industri |
Depositing User: | Dede Muksin Lubis |
Date Deposited: | 20 Nov 2019 02:39 |
Last Modified: | 20 Nov 2019 02:39 |
URI: | http://repository.mercubuana.ac.id/id/eprint/52088 |
Actions (login required)
![]() |
View Item |