PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE EXTENDED HALF SLAB PROYEK TOL DEPOK - ANTASARI

PAMUNGKAS, A. RISKI BANI (2018) PELAKSANAAN PEKERJAAN STRUKTUR JEMBATAN METODE EXTENDED HALF SLAB PROYEK TOL DEPOK - ANTASARI. S1 thesis, Universitas Mercu Buana Jakarta.

[img]
Preview
Text
1. Cover.pdf

Download (137kB) | Preview
[img]
Preview
Text
5. Abstrak.pdf

Download (187kB) | Preview
[img]
Preview
Text
2. Surat pernyataan.pdf

Download (573kB) | Preview
[img]
Preview
Text (LEMBAR PENGESAHAN)
3. Lembar Pengesahan.pdf

Download (500kB) | Preview
[img]
Preview
Text
4. Kata Pengatar.pdf

Download (189kB) | Preview
[img]
Preview
Text
6. Daftar isi.pdf

Download (194kB) | Preview
[img]
Preview
Text
7. Daftar Gambar.pdf

Download (193kB) | Preview
[img]
Preview
Text
8. BAB I.pdf

Download (386kB) | Preview
[img]
Preview
Text
9. BAB II.pdf

Download (2MB) | Preview
[img]
Preview
Text
10. BAB III.pdf

Download (694kB) | Preview
[img]
Preview
Text
11. BAB IV.pdf

Download (2MB) | Preview
[img]
Preview
Text
13. BAB VI.pdf

Download (5MB) | Preview
[img]
Preview
Text
14. BAB VII.pdf

Download (339kB) | Preview
[img]
Preview
Text
15. BAB VIII.pdf

Download (119kB) | Preview
[img]
Preview
Text
16. Daftar Pustaka.pdf

Download (84kB) | Preview

Abstract

Proyek pembangunan insfrastruktur Tol Depok – Antasari tahap-2 yang menghubungkan ruas brigif - sawangan dengan panjang jalan 6,265 km, awal pekerjaan pada sta. 05+775.247 s/d 12+040. Laporan Kerja Pratik ini membahas tentang Pelaksanaan Pekerjaan Struktur Jembatan Extended Half Slab dengan jumlah pier 17 dan 2 abutment dengan menggunakan pondasi bored pile diameter 80 cm yang rata-rata kedalaman 27 m. Metode half slab dipilih karena dapat mempercepat masa kontruksi serta mempermudah metode pelaksanaan di lapangan dengan precast half slab. Kata kunci : Kerja Praktek, Pelaksanaan Pekerjaan Struktur Jembatan Metode Extended Half Slab Proyek Tol Depok - Antasari

Item Type: Thesis (S1)
Call Number CD: KP/SIP. 19 057
NIM/NIDN Creators: 41115110092
Uncontrolled Keywords: Kerja Praktek, Pelaksanaan Pekerjaan Struktur Jembatan Metode Extended Half Slab Proyek Tol Depok - Antasari
Subjects: 600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil
600 Technology/Teknologi > 620 Engineering and Applied Operations/Ilmu Teknik dan operasi Terapan > 624 Civil Engineering/Teknik Sipil > 624.2 Bridges Engineering/Teknik Jembatan
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 725 Public Structures Architecture/Arsitektur Struktur Umum
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 725 Public Structures Architecture/Arsitektur Struktur Umum > 725.9 Other Public Structures Architecture/Arsitektur Struktur Umum Lainnya
700 Arts/Seni, Seni Rupa, Kesenian > 720 Architecture/Arsitektur > 725 Public Structures Architecture/Arsitektur Struktur Umum > 725.9 Other Public Structures Architecture/Arsitektur Struktur Umum Lainnya > 725.98 Bridges, Tunnels, Moats/Jembatan, Terowongan
Divisions: Fakultas Teknik > Teknik Sipil
Depositing User: Dede Muksin Lubis
Date Deposited: 25 Apr 2019 01:20
Last Modified: 13 Mar 2023 08:23
URI: http://repository.mercubuana.ac.id/id/eprint/48576

Actions (login required)

View Item View Item