Usulan Implementasi Total Productive Maintenance pada Container Crane Studi Kasus Container Crane 11 dan 12 di PT. XYZ

Maromi, Bujang (2012) Usulan Implementasi Total Productive Maintenance pada Container Crane Studi Kasus Container Crane 11 dan 12 di PT. XYZ. S2 thesis, Universitas Mercu Buana.

[img]
Preview
Text (Cover)
01. Hal Cover.pdf

Download (529kB) | Preview
[img]
Preview
Text (Abstrak)
02. Abstrak.pdf

Download (52kB) | Preview
[img] Text (Bab 1)
03. Bab 1.pdf
Restricted to Registered users only

Download (88kB)
[img] Text (Bab 2)
04. bab 2.pdf
Restricted to Registered users only

Download (187kB)
[img] Text (Bab 3)
05. Bab 3.pdf
Restricted to Registered users only

Download (98kB)
[img] Text (Bab 4)
06. Bab 4.pdf
Restricted to Registered users only

Download (2MB)
[img] Text (Bab 5)
07. Bab 5.pdf
Restricted to Registered users only

Download (206kB)
[img] Text (Bab 6)
08. Bab 6.pdf
Restricted to Registered users only

Download (61kB)
[img] Text (Daftar Pustaka)
09. Hal Daftar Pustaka dan Lampiran.pdf
Restricted to Registered users only

Download (157kB)

Abstract

Dalam dunia industri saat ini, idealnya peralatan dan mesin produksi dapat beroperasi sampai dengan 100% yang mana dalam kondisi kapasitas penuh dapat menghasilkan kualitas produk sebesar 100% sesuai dengan permintaan konsumen. Namun demikian kenyataannya kondisi ini sangat sulit terjadi. Untuk menjaga kondisi mesin tersebut agar tidak mengalami kerusakan atau untuk mengurangi waktu kerusakannya agar proses produksi tidak terlalu lama berhenti, maka dibutuhkan sistem perawatan dan pemeliharaan mesin/peralatan yang baik dan tepat mengingat Container Crane yang saat ini menghasilkan layanan bongkar muat petikemas di PT XYZ telah berumur lebih dari 33 tahun. Penelitian ini bertujuan untuk mengetahui tingkat efektivitas penggunaan mesin/peralatan produksi, dengan cara melakukan perhitungan Overall Equipment Effectiveness (OEE), dan untuk mengetahui adanya masing-masing faktor kerugian pada enam kerugian besar (six big losses) yang memiliki kontribusi terbesar dalam menghambat produktifitas mesin dengan menggunakan diagram Pareto. Disamping itu, TPM akan dikombinasikan dengan Root cause analisys menggunakan metode pro aktif. Berdasarkan hasil penelitian yang dilakukan, penulis menyarankan untuk melaksanakan TPM, dan terus melakukan evaluasi dan mengkaji ulang terhadap Overall Equipment Effectiveness (OEE) mesin untuk dapat meningkatkan produktivitas melalui TPM dengan menggunakan predictive maintenance, preventive maintenance dan root cause analysis dengan metode pro aktif sebagai bagian dari strategi pemeliharaan agar dapat meramal/memprediksi kegagalan yang akan timbul dimasa yang akan datang. Kata kunci : Overall Equipment Effectiveness, Root Cause Analysis, Autonomous Maintenance, Continous Maintenance, Failure Modes and Affect Analysis In the industrial world today, ideally equipment and production machinery can operate up to 100% which is in condition to full capacity can produce 100% quality products in accordance with consumer demand. However, in reality this condition is very difficult. To maintain the condition of the machine so that no damage or to reduce the damage that the production process is not too long to stop, then the system needs maintenance and care of machinery / equipment in a good condition, given that the Container Crane (CC) 11 and 12 currently generating service loading and unloading containers in PT XYZ has aged over 33 years. This study aimed to determine the effectiveness of the use of machinery / equipment manufacturing, by calculating Overall Equipment Effectiveness (OEE), and for the presence of each of these factors in the loss of six big losses (six big losses) that has the largest contribution in inhibiting productivity machine using Pareto diagram. In addition, the TPM will be combined with the root cause analysis using proactive methods. Based on the research conducted, the authors suggest implementing Total Productive Maintenance (TPM), and continue to evaluate and review the Overall Equipment Effectiveness (OEE) machine to improve productivity through TPM by using predictive maintenance, preventive maintenance and root cause analysis as a proactive method Key Words : Overall Equipment Effectiveness, Root Cause Analysis, Autonomous Maintenance, Continous Maintenance, Failure Modes and Affect Analysis

Item Type: Thesis (S2)
Call Number CD: CDT-553-12-009
Call Number: TI/53/13/029
NIM/NIDN Creators: 55309120031
Uncontrolled Keywords: Overall Equipment Effectiveness, Root Cause Analysis, Autonomous Maintenance, Continous Maintenance,
Subjects: 600 Technology/Teknologi > 670 Manufacturing/Manufaktur, Pabrik-pabrik
Divisions: Pascasarjana > Magister Teknik Industri
Depositing User: Admin Perpus UMB
Date Deposited: 16 Jul 2013 10:07
Last Modified: 11 Jul 2022 03:15
URI: http://repository.mercubuana.ac.id/id/eprint/15058

Actions (login required)

View Item View Item